Application of Air DTH Hammer Technology to Fast Drilling in Red Beds of Yunnan Province
详细信息   
摘要

During the implementation of the project to search water in red beds of Yunnan Province, the air DTH hammer has finished 650.5 m drilling at one well on average in 20 days. Compared with the traditional drilling technology, it has increased the drill footage by 235.2% on average with maxim up to 337%. And the average output of water by a signal well is increased by 140.8% on average with maximum 235.7%. The effort of water-search using the air DTH hammer technology has achieved remarkable economic and social effects. This paper presents the details of technical approach, equipment choice, and application effects of air hammer drilling technology.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700