Based on survey design, analysis of deviation and precision and guiding construction for perforation of new flood discharge channels in the tailings pond of the Sifang gold mine, some survey experiences for perforation of long flood discharge channels in complex terrain have been made, which should have some significances in guiding perforation survey.