The thick overburden in Hekoucun dam foundation is one of major engineering geological problems in the construction of the dam.The overburden is 41.87 m high at most,and is very complex in composition and extremely uneven in geological structure.The distribution and engineering geological characteristics are basically known by investigation,test and so on,and its impact upon the reservoir is analyzed,therefore providing scientific basis for the design of reservoir.