Numerical Simulation about Influences of Steep Inclined Coal Pillar after Mining on Laneway

详细信息   
摘要
In order to improve the recovery and economic benefit of the coal mine, ANSYS finite element software is adopted to make numerical simulation for-230~-310 level coal pillar before and after mining, aiming at No.4 groove coal pillar of Changgouyu mine, and it is obtained: 1) after coal pillar mining, total of coal and rock mass is sinking, but it has little influence to-140 level laneway; 2) after mining, the middle position of coal pillar is transition region; and 3) the principal stress of coal pillar nearby-140 level after mining increases. The results obtained by numerical simulation agree well with actual mining, so numerical simulation about influences of steep inclined coal pillar after mining on laneway has certain guiding significance for mining.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700