Drilling and Completion Technology for WH-1 Ultra-Deep Geothermal Well
详细信息   
摘要
According to the design requirements and geological characteristics, rotary drilling, mud pump positive cycle, cone bit,pressure by drill collar processes were adopted in the construction of Well WH-1. The formation structure and spatial distribution of aquifer within logging depth were got through geophysical logging. Good plugging effect was obtained by mud density reduction, viscosity enhancing, mud thickening and adding an appropriate amount of blocking agent. The pumping test shows the good water yield ability, good water abundance in geothermal reservoir aquifer and the water temperature is not affected by air temperature. The water temperature loss is small in the well flow test, which proves that the drilling and completion technologies are rational.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700