摘要
The construction of root pile in underground cable tunnel timbering was depicted; root pile was characteristic of soil stripping and water proof, the foundation pit fencing was conducted. In combination with the observation of surface lateral displacement and peripheral subsidence, the root pile timbering system was testified to be safe and reliable and characteristic of confined and lateral displacement.