Case Study on Risk Forecast Technique during Tunnel Construction at Karst Area
详细信息   
摘要
In this paper, taking the Yinjiayan tunnel as the example, during the construction of  the tunnel, the comprehensive geological prediction technology is implemented strictly for the tunnel complex karst geological environment conditions, which is successful to predict the karst cave in front of the tunnel face. According to the comparative analysis between the forecast result and geologic conditions in this tunnel, the accuracy of the overall prediction is more than 90%. In a word, it is confirmed that the comprehensive prediction method has the high efficiency and systematic properties.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700