摘要
In this paper, taking the Yinjiayan tunnel as the example, during the construction of the tunnel, the comprehensive geological prediction technology is implemented strictly for the tunnel complex karst geological environment conditions, which is successful to predict the karst cave in front of the tunnel face. According to the comparative analysis between the forecast result and geologic conditions in this tunnel, the accuracy of the overall prediction is more than 90%. In a word, it is confirmed that the comprehensive prediction method has the high efficiency and systematic properties.