Technological and Economic Results of Orebody Secondary Delineation in Tongken Mine, Dachang Ore Field
详细信息   
摘要

Mining operation has been conducted recently in Tongken mine, focusing on No.92 lean orebody, while the thickness of the ore is reducing rapidly with irregular shape and more branches and composite parts. In order to improve the economic effectiveness, it is in urgent need to delineate the boundary of the orebody again and put it in control. After several years practice it proves that secondary delineation of the orebody boundary during mining operation at the district of lean ore and side ore is a very important way to achieve economic effectiveness for mining company as it effectively reduces the loss due to dilution.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700