Application of Kachugin Method in Bank Slump Prediction at North Reservoir Bank of Xiangxi Ferry

详细信息   
摘要
In Three Gorges area, the No.3 geologic hazard prevention involves 44 engineerings about reservoir bank. And the bank slump prediction is the very important basis of reservoir bank regulation design. This paper adopts Kachugin method to do bank slump prediction about Tanjiacao gully segment in north reservoir bank of Xiangxi ferry on the basis of systematic analyzing its geological engineering condition. According to the predictive result, the authors put forward the engineering harnessing measure of Tanjiacao gully segment which includes overall adopting two-stage supporting and retaining structure, setting up antisliding pile respectively at the toe of slope and lower and lower slope segment in the place of southside Zixing road.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700