Borehole Deviation Correcting and Controlling Technical Measures in Heishan Mining Area of Chengde

详细信息   
摘要

///Azimuth error and borehole top angle oversize were the difficult problems in drilling construction in Heishan mining area of Chengde. LZ-7389whipstock was used for deviation correction with good effect. Based on the analysis on the causes of borehole running deviation and summary on the construction experience, the technical measures of borehole deviation prevention were put forward.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700