Technical Analysis on Radial Horizontal Well for Development of Coalbed Methane of Low Coal Rank
A new method to improve the production of low rank coalbed methane is put forward, in which radial horizontal well is drilled earlier than hydraulic fracturing. The aim is to expand and communicate more endogenic fissures in coal seam by the radial horizontal well drilled in advance and then enhance gas production. According to the coal seam conditions of Fuxin Liujia block and