摘要
///Dongsheng station uses rockfill concrete gravity retaining structures, it is difficult in foundation consolidation grouting in drilling construction. According to specific circumstances, firstly, the authors threw stones, grouted, and drilled, then, the overall consolidation grouted solutions to solve this problem. It improves the overall efficiency of construction, and inspection, consolidation grouting effect is obvious, and meets the design requirements.