Application of Integrated Electric Methods to the Exploration of Deep Concealed
An integrated application of such means of the intermediate gradient installment as the time-domain IP method, controlled source audio-frequency magnetotelluric sounding method and phase IP method was tested in the exploration of metallic ore deposits in the Deerbugan polymetallic ore belt in northeastern Inner Mongolia, with excellent result obtained. This paper shows that the application of multiple parameters to the integrated analysis is characterized by mutual supplement and mutual verification, has abundant information, reduces the multi-solution possibility in geophysical exploration and improves the reliability of geological integration.