摘要
In this paper, the construction conditions of the Hutuo River groundwater reservoir are analyzed. The conclusions can be drawn. The boundaries of Hutuo river groundwater reservoir are nearly closed, and the storage capacity is as high as 10.04×108 m3. The Hutuo River bed can be used as natural groundwater reservoir leakage field. Based on forecast results, under different guarantee rate in 2020 and 2030, surplus water can be used for storage and regulation of the groundwater reservoir, and the regulating water quality has little effect on groundwater quality.