This paper established the construction methods for MT standard network at the Tibetan Plateau and North China after analyzing the MT equipment, data acquisition and processing. Field observation and experiment was conducted at the standard stations (11535 and 11635) at the Heze district of Shangdong province. The data of broad-band and long period MT data was processed in detailed. The techniques and data on methods central and accessory station deployment, data acquisition time, processing and remote reference, which were obtained from the field experiments, will be used to instruct the construction of magnetotelluric (MT) standard network in the Tibetan Plateau and North China and will provide technical support to construct MT standard network at other parts of China.