Geothermal power plant projects in Central America :
详细信息    Geothermal power plant projects in Central America :
  • 出版日期:2012.
  • 出版者:United Nations University, Geothermal Training Programme,
  • 页数:x, 76 p. :
  • 出版地:Reykjavík :
  • 第一责任说明:by José Roberto Estévez Salas.
  • 尺寸:24 cm.
  • 分类号:a485.4
  • ISBN:978-9979-68-323-0(pbk.) :
MARC全文
02h0044517 20131212165829.0 131211s2012 ic ab frb |000|||eng | 978-9979-68-323-0(pbk.) : CNY100.00 NGL NGL NGL nc----- 333.88 a485.4 Estévez Salas, José Roberto. Geothermal power plant projects in Central America : technical and financial feasibility assessment model / by José Roberto Estévez Salas. Reykjavík : United Nations University, Geothermal Training Programme, 2012. x, 76 p. : ill., maps ; 24 cm. Report, 1670-7427 ; 2012, no.4 MSc thesis. ; United Nations University Geothermal Training Programme. Includes bibliographic reference. The geothermal resource potential makes the Central American region a prime candidate for investment in electricity power plant projects. In this study, the technical and financial feasibility of developing geothermal power plant projects in Central America is conducted. Three thermodynamic models of two groups of conventional power plants are evaluated for a range of possible values of geothermal resource temperatures (100-340°C) and mass flow rates (100-1,000 kg/s) in order to examine multiple expected scenarios. The main results are presented as contour maps of the internal rate of return (IRR) of free cash flow to equity (FCFE), net power plant output and the probability of success of accomplishing the minimum rate of return required by private investors. By using these maps, geothermal developers, who already characterize the quality of resources for geothermal projects, could identify technically and financially viable projects in terms of temperature and mass flow rate, taking into account the assumptions and limitations considered in the models. The results indicate that the geothermal power plant’s size, profitability indicators and the probability of success of geothermal power development arise from an increase in the temperature of the geothermal resource and mass flow rate. As a result, geothermal power development projects in Central America for a small power plant are not attractive to private investors, when taking into account the project’s cost of exploration and confirmation, drilling of an unknown field, and construction of the power plant and transmission line. Geothermal engineering Central America. Report / UNU Geothermal Training Programme ; 2012, no. 4. aCN b010001 NGL P 485.066 R29 v2012/4 ; h1 ; rCNY100.00 gljx1305

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700