Settlements caused by the construction of the Tren Urbano in Rio Piedras using a tunnel boring machine (Puerto Rico)
详细信息    Settlements caused by the construction of the Tren Urbano in Rio Piedras using a tunnel boring machine (Puerto Rico)
  • 出版日期:2002.
  • 页数:121 p. :
  • 第一责任说明:Maribell Perez Merced.
  • 分类号:a854 ; a476
MARC全文
02h0025728 20111011111823.0 cr un||||||||| 111011s2002 xx ||||f|||d||||||||eng | AAI1413179 CNY371.35 NGL NGL NGL a854 ; a476 Perez Merced, Maribell. Settlements caused by the construction of the Tren Urbano in Rio Piedras using a tunnel boring machine (Puerto Rico) [electronic resource] / Maribell Perez Merced. 2002. 121 p. : digital, PDF file. Source: Masters Abstracts International, Volume: 41-05, page: 1512. ; Adviser: Juan B. Bernal Vera. Thesis (M.E.)--University of Puerto Rico, Mayaguez (Puerto Rico), 2002. The construction of Section 7 of the Tren Urbano in Río Piedras includes two underground stations, the Rio Piedras and the UPR Station. To connect the stations, two circular parallel tunnels were constructed using an Earth Pressure Balance Machine (EPBM). The length of each tunnel is 433.2 m and each one have an inside diameter of 5.8 m. The tunnels were excavated through alluvial deposits belonging to the Hato Rey Formation that consists mainly of silty clays, sandy clays and sands.;Since the tunneling activities took place beneath a commercial and residential zone, a geotechnical monitoring program was implemented to protect the structures. Monitoring data was compiled, summarized and analyzed in an attempt to relate the ground displacements with the construction activities. Also a comparison of the actual settlement with the predicted settlement was made.;One tendency observed from the gathered data was a small amount of movement generated ahead of the machine location. However, most of the settlements occurred immediately behind the location of the EPBM. Also the data demonstrates that surface settlement decrease in magnitude moving away from the center line between tunnels. Actual settlements were higher than predicted. Surface settlement has a clear effect in the structures, but no structural damage was reported. Application of the consolidation and compensation grout program proved to be successful in reducing the settlements of the overlying structures. Tunneling ; Tunnels ; Soils Puerto Rico ; Rio Piedras. ; Puerto Rico ; Rio Piedras. Effect of underground construction on. Electronic books. aeBook. aCN bNGL http://proquest.calis.edu.cn/umi/detail_usmark.jsp?searchword=pub_number%3DAAI1413179&singlesearch=no&channelid=%CF%B8%C0%C0&record=1 NGL Bs1025 rCNY371.35 ; h1 bs1108

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700