Cover Picture: Geomechanics and Tunnelling 1/2017
详细信息    查看全文
  • 刊名:Geomechanics and Tunnelling
  • 出版年:2017
  • 出版时间:February 2017
  • 年:2017
  • 卷:10
  • 期:1
  • 全文大小:828K
  • ISSN:1865-7389
文摘
The new Eibsee cable car is being built on the highest construction site in Germany, the Zugspitze, to replace the old cable car from 1963. About 1,000 m3 of rock had to be removed for the new mountain station. Altogether 1,200 m3 of concrete, 500 t of steel and 330 t of reinforcement were used for the building. The new summit station is designed with a free-standing area projecting 30 m. in order to secure and back-anchor the foundation, DSI supplied numerous anchors of various types (see page 92). Photo: Hajo Dietz.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700