Remedial Process Optimization and Ozone Sparging for Petroleum Hydrocarbon-Impacted Groundwater
详细信息    查看全文
文摘
A former natural gas processing station is impacted with total petroleum hydrocarbons (TPH) and benzene. Remedial process optimization (RPO) was conducted to evaluate the effectiveness of the historical air sparging/soil vapor extraction (AS/SVE) system and the current groundwater extraction and treatment system. The RPO indicated that both remedial activities offered no further benefit in meeting remediation goals. Instead, an in situ chemical oxidation (ISCO) system was recommended. Ozone was selected, and the results of a bench test indicated that the ozone demand was 8 to 12 mg ozone/mg TPH and that secondary by-products would include hexavalent chromium and bromate. A capture zone analysis was conducted through groundwater flow modeling (MODFLOW) to ensure containment of the injected oxidant using the existing groundwater extraction system. Results of a pilot study indicated that the optimum frequency of ozone sparging is 60 minutes in order to reach a maximum radius of influence of 20 feet. TPH concentrations within the treatment zone decreased by 97 percent over two months of ozone sparging. Concentrations of hexavalent chromium and bromate increased from nondetect to 44 and 110 mg/L, respectively, during the ozone sparging but attenuated to nondetectable concentrations within three months of system shut down.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700