Optimal preventive maintenance policy for electric power distribution systems based on the fuzzy AHP methods
详细信息    查看全文
文摘
In power distribution systems, with their great vastness and various outage causes, one of the most important problems of power distribution companies is to select a suitable maintenance strategy of system elements and method of financial planning for the maintenance of system elements with the two objectives of decrease in outage costs and improvement of system reliability. In this article, a practical method is introduced for the selection of a suitable system elements maintenance strategy; moreover, to plan the preventive maintenance budget for the system elements, two methods are offered: the cost optimization method and the fuzzy Analytic Hierarchy Process (AHP) method. In the former method, a new model of system maintenance cost is offered. This model, based on system outage information, the elements maintenance costs are determined as functions of system reliability indices and preventive maintenance budget. The latter method, too, a new guideline is introduced for considering the cost and reliability criteria in the trend of preventive maintenance budget planning. In this method, the preventive maintenance budget for the elements is determined based on relative priority of elements with reliability criteria.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700