Integrated production and delivery with single machine and multiple vehicles
详细信息    查看全文
文摘

We consider multi-objective scheduling with a single machine and multiple vehicles.

The goal is to minimize vehicle delivery and total customer waiting time.

We propose a PD-NSGA-II algorithm for this NP-hard problem.

The performance of the algorithm is tested through random data.

It is shown that the algorithm can offer high-quality solutions in reasonable time.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700