Prestress losses were measured for two, full size double-tee beams.
The beams were cast with lightweight self-consolidating concrete.
Prestress losses were measured continuously from detensioning until 26 days after casting.
The AASHTO-LRFD Approximate Method provided the most accurate estimation of prestress losses.