With 5% allowance auctioned, the electric power generation sector’s marginal abatement cost will increase 0.244 Yuan/kW h.
Allowance auction will increase the expenses by China’s electric power generation sector.
Auctioning as an initial allocation in China’s carbon trading market will be challenging.