Pathways of 3-biofules (hydrogen, ethanol and methane) production from petrochemical industry wastewater via anaerobic packed bed baffled reactor inoculated with mixed culture bacteria
详细信息    查看全文
文摘

Bio-energy production from MEG contaminated wastewater via AnPBBR, was assessed.

Maximum concurrent H2 and CH4 production of 6.57 and 3.57 L/d were obtained.

Maximum ethanol generation of 237.13 mg/L was observed at a HRT of 9 h.

At OLRs up to 4 gCOD/L/d, MEG biodegradability of 71–98% was achieved.

AnPBBR economically achieved shorter payback period (6.25 y), compared to ABR.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700