An energetic and economic analysis of eleven industrial CHP plants was performed.
Both design and experimental data have been considered.
The effect of national incentives on economic profitability has also been investigated.
In the design phase, the simple payback time is usually underestimated.
Economic incentives allow an average SPB reduction of about 15–20%.