Research on integration of roadway excavation, bolting, support, and detection
详细信息    查看全文
文摘
According to the situation that temporary support equipment is backward, new type temporary support equipment is developed. This temporary support equipment can support roof and front wall of roadway quickly, can reduce roof subsidence, roof fall accidents, front wall collapse, and labor intensity, and has high economic and wide application value. Integration ideas of roadway excavation, bolting, support, and detection is put forward, i.e. to make roadheader as a platform and combine new type temporary support equipment, new type bolter, and detection devices with roadheader to achieve reasonable dynamic roof support design and safe rapid roadway excavation.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700