A hybrid ground-source heat pump with auxiliary heat source had be proposed.
Feasibility and performance of HGSHP in Shenyang had been investigated deeply.
Soil temperature for ten years simulation was vital to evaluate performance.
Auxiliary heat source could improve GSHP performance in Shenyang.