Reliability analysis of Diesel Generator power supply system of Prototype Fast Breeder Reactor
详细信息    查看全文
文摘
The unavailability of DG success is 4.75E−3 for 2/4 and 1.47E−3 for 1/4. Modeling includes sub systems like CB, SSWS, Fuel oil system & 220 V DC. DG-FR, DG-FR-CCF and DG maintenance is major contributors of DG unavailability. Uncertainty analysis has been carried out through Monte Carlo simulations. Sensitivity analysis identifies DG mechanical FR as most sensitive part.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700