Investigation on energy storage and quick load change control of subcritical circulating fluidized bed boiler units
详细信息    查看全文
文摘
The model of energy storage of subcritical CFB boilers is established. The capacity and increment rate of heat storage are quantified. A novel load control strategy is proposed to improve the quick load change ability. An application on the 300 MW CFB unit proves the load change rate to 5–8 MW/min.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700