Overall energy balance of steam reformer and HT-PEMFC integrated system is analysed.
Steam reformer with WGSR is needed to achieve high system efficiency.
External heat is required to maintain steam reforming.
60% heat is required to preheat reformer fuel as increase in S/C ratio from 4 to 6.
Proper structure of heat exchanger is needed to optimise system integration.