We introduce a novel facility and equipment selection model for whey utilisation.
The model selects the optimal combination of equipment, site locations and routes.
The model suggests the investments that better release productive potential.
Case study results show that important savings can be achieved by adequate investment.
Differences in equipment availability and costs affect processing facility location.