Fast screening techniques and process for grid interconnection of wind-storage systems
详细信息    查看全文
文摘
class="listitem" id="list_ulist0010">
class="label">•

A method of predetermining the maximum power output of a wind farm is proposed.

class="label">•

Time-varying operating status of distribution systems is addressed.

class="label">•

Solution to the complicated operation problem of a wind-energy system is proposed.

class="label">•

Simplified initial review process of grid-interconnection applications is proposed.

class="label">•

Time and expense of reviewing wind-storage system interconnection is great reduced.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700