A method of predetermining the maximum power output of a wind farm is proposed.
Time-varying operating status of distribution systems is addressed.
Solution to the complicated operation problem of a wind-energy system is proposed.
Simplified initial review process of grid-interconnection applications is proposed.
Time and expense of reviewing wind-storage system interconnection is great reduced.