The two production schemes share the same maximum throughput.
The optimal assignments can be transformed into each other in polynomial time.
The two schemes are equivalent in terms of server-time allocation.
The optimal solutions remain unchanged even when constraints are relaxed.
Problems under both schemes can be solved through linear programmes.