Load forecasting and dispatch optimisation for decentralised co-generation plant with dual energy storage
详细信息    查看全文
文摘
Open software components for load prediction and rolling horizon CHP plant optimisation are described. Results indicated that solver overheads increased 380-fold during low heat load periods. Solving times <1 s were regained by considering differing dispatch and unit commitment horizons. 32% cost reductions were observed through balancing market interaction when load prediction inaccuracies were present. Results indicated costs were significantly more sensitive to prediction accuracy than plant model accuracy.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700