We propose a procedure for complementary flowback and post-flowback data analysis.
This procedure reduces the uncertainty in reservoir parameter estimates.
The proposed procedure is applicable to transient two-phase pressure and rate data.
Field application estimates the effective pore-volume and half-length of active fractures.
Secondary fractures and desorption play key roles during post-flowback production.