A stochastic global optimization framework for open pit mining complexes is proposed.
The method simultaneously optimizes production schedules and downstream processes.
The modeling is flexible and may be applied to numerous types of mining complexes.
Three combinations of metaheuristics are tested.
Results from an example show a substantial economic benefit when using this approach.