An investigation into the factors which affect railway bridge deterioration was performed.
A novel approach to the analysis was developed using a network analysis methodology.
Incorporation of the key factors into an established bridge model for WLCC outputs.
WLCC outputs show the effect each attribute would have on a railway bridge portfolio budget.