The impact of oil price uncertainty is analyzed for an African oil project. Geometric Brownian motion is used to model prices. Petrel® and Eclipse® software are used to calculate production profiles. A timing option and interaction between a scale and a timing option were evaluated. Managerial flexibility added value to the project and changed the decision.