We propose an imperfect periodic preventive maintenance model for leased equipment.
It can distinguish between the impact from internal degradation and that from external shocks.
An internal–external interactive mechanism is proposed.
Two improvement factors are introduced into the modeling of imperfect maintenance.
The model is helpful for the PM scheduling of the same equipment rented by different lessees.