Monitoring the Quarry Pit Development
详细信息    查看全文
文摘
Planning and maintaining intact pit slopes in a quarry/mine pit is an important aspect for a sustainable quarry development and operation. It is a main concern in ensuring the constructed pit slopes and benches are stable and safe during quarrying operation activities as well as after permanent closure of a quarry pit. An appraisal for slope instability and failures is conducted at the quarry pit of the Lafarge Rawang Sdn. Bhd. which is located in Rawang, Selangor. Determination of the failures level, integrity and governing geological parameters the contributed to the failures, stability and the hazards are done by field observation, geological mapping and geophysical surveys. The earth resistivity and seismic imaging surveys were conducted to image the subsurface condition such as extent and thickness of limestone bedrock and overburden, including suspicious features like the presence of underground seepage, sinkhole and soil/rock inferred strength indirectly. Occurrences of a few slope failures are considered minor, small scale and localized in nature. The rock slope failures mainly due to structural parameters of the in-situ rock which imposed a heavy jointing intersection and rock bedding plane that coincidently constructed parallel to pit slope face.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700