Analysis of tower foundation stability along the Qinghai-Tibet Power Transmission Line and impact of the route on the permafrost
详细信息    查看全文
文摘

Re-freezing process of tower foundation soils and its impact factors are analyzed.

Thermal regimes of tower foundation soils during a 4-year operation phase are analyzed.

Displacement development of tower foundations and the mechanism are analyzed.

Recommendations for construction and design of piles and footings are put forward.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700