The design and the status of the 140 GHz/4 MW/1000 s ECRH system on EAST tokamak is described in detail.
Two of the four gyrotrons are tested in factory.
The transmission line and the equatorial launcher for the first 2 MW system are ready for installation.
Series tests have been carried out for the most critical elements for the real-time launcher.
The auxiliary system includes the water cooling system, the HVPS system, the vacuum system have been installed and tested.