An investigation of reactive power planning based on chance constrained programming
详细信息    查看全文
文摘
Deregulation in the electricity supply industry has brought many new challenges to the problem of reactive power planning. Although the problem has been extensively studied, available standard optimization models and methods do not offer good solutions to this problem, especially in a competitive electricity market environment where many factors are uncertain. Given this background, a novel method for reactive power planning based on chance constrained programming is presented in this paper, with uncertain factors taken into account. A stochastic optimization model is first formulated under the presumption that the generator outputs and load demands can be modeled as specified probability distributions. A method is then presented for solving the optimization problem using the Monte Carlo simulation method and genetic algorithm. Finally, a case study is used to illustrate the validity and essential features of the proposed model and methodology.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700