Analysis of material flow and consumption in cement production process
详细信息    查看全文
文摘

The material flow route for a cement plant was obtained.

Three mass balances for three cement production stages were established.

Each ton of products requires 2.48, 4.69, and 3.41 t of materials in three stages.

Waste gas recycling rate in clinker production is higher than in other stages.

Recycling waste gas discharged from raw and cement mills should be the focus.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700