The main reason of this late consideration of HF is that there exist few methods and models for anticipating the influence of fundamental design options on the future performance of operation teams.
This paper describes a set of new tools permitting (i) determination of the impact of the fundamental process design options on the future activity of the operation teams and (ii) assessment of the influence of these operational constraints on teams performance. These tools are intended to guide the design of future 4th generation (GEN4) reactors, within the frame of a global risk-informed design approach, considering technical and human reliability exigencies in a balanced way.