Research on the intermediate process of a free-piston linear generator from cold start-up to stable operation: Numerical model and experimental results
详细信息    查看全文
文摘

The intermediate process of free-piston linear generator is investigated for the first time.

“Gradually switching strategy” is the best strategy in the intermediate process.

Switching at the top dead center position timing has the least influences on free-piston linear generator.

After the intermediate process, the operation parameters value is smaller than those before the intermediate process.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700