Modeling construction time in Spanish building projects
详细信息    查看全文
文摘

We propose a forecast model to estimate the construction time of new builds.

Gross floor area (GFA) has greater influence than cost on the construction speed.

Both GFA and cost are necessary factors to obtain the most accurate forecast model.

We develop a stability analysis to validate the proposed forecast model.

We analyze the model sensitivity versus the variability of construction costs.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700