Minimizing total cost using reconfiguration and capacitor banks switching considering DGs.
Dynamic scheduling of reconfiguration and capacitor banks switches for a period.
Stochastic Calculations due to the variant output generation of the DG.
Thorough cost func. including transformer loss of life, switching and other costs.