Comment on “Hybrid DE-SQP algorithm for non-convex short term hydrothermal scheduling problem” by S. Sivasubramani and K. Shanti Swarup [Energy Convers. Manage. 52 (2011) 757-761]
详细信息    查看全文
文摘
This paper aims to analyze the inaccuracies occurred in “Hybrid DE–SQP algorithm for non-convex short term hydrothermal scheduling problem” by S. Sivasubramani and K. Shanti Swarup [Energy Convers. Manage. 52 (2011) 757–761]. The original paper Sivasubramani and Shanti Swarup (2011) has proposed the differential evolution (DE) and sequential quadratic programming (SQP) method to solve the non-convex short term hydrothermal scheduling problem, but the offered solution is not satisfactory, while considering the constraints of reservoir storage volume, the ultimate reservoir storage volumes of hydro-units and the power produced by such units.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700