Short-term Hydrothermal Generation Scheduling Using a Parallelized Stochastic Mixed-integer Linear Programming Algorithm
详细信息    查看全文
文摘
Short-term hydrothermal generation scheduling (STHTGS) is the optimization process through which decisions are made about the commitments of thermal generators and the allocation of hydro energy resources in the planning horizon (1 day to 1 week), while satisfying a large set of technical constraints. Uncertainty in this problem may appear in different modelling parameters, but the extended stochastic version of the STHTGS problem may lead to impractical solution times. This paper discusses the application of a parallelized stochastic mixed-integer linear program (SMILP) to solve the stochastic STHTGS problem. In order to decrease simulation time a scenario-based decomposition approach based on the progressive hedging (PH) algorithm is proposed. Computational experiments are conducted in two multi-processor nodes of a cluster for different numbers of stochastic scenarios. The algorithm is tested in the Chilean Central Interconnected System using a problem instance considering a weekly horizon with hourly resolution. Results show that the PH algorithm has good convergence properties, needing only a few iterations to converge. Furthermore, as PH generates similarly sized sub-problems, the parallel version of the algorithm scales up quite well as the number of scenarios is increased.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700